Difference between revisions of "Capability Maturity vs. Work on Proposals"

From Cibernética Americana
Line 4: Line 4:
 
<br/><br><blockquote>
 
<br/><br><blockquote>
 
I've prepared this text to efficiently process to common currently occurring and related phenomena.
 
I've prepared this text to efficiently process to common currently occurring and related phenomena.
<blockquote>
+
<ul>
<br/><br><blockquote>
+
<li><blockquote>
 
The first is the amount of unpaid work I can put in a lead before I must have some payment if I have not decided to do the work on some other basis.
 
The first is the amount of unpaid work I can put in a lead before I must have some payment if I have not decided to do the work on some other basis.
  
 +
</blockquote>
 +
<li><blockquote>
 +
The second is so-called [[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]] CIMM , which has to do with the reliablity of estimates in CMM Level I situations.
 +
 +
</blockquote>
 +
</li>
 
</blockquote>
 
</blockquote>
 
<br/><br></font>
 
<br/><br></font>
 
</td></tr></table>
 
</td></tr></table>
 
</html>
 
</html>

Revision as of 09:30, 21 January 2011



I've prepared this text to efficiently process to common currently occurring and related phenomena.

  • The first is the amount of unpaid work I can put in a lead before I must have some payment if I have not decided to do the work on some other basis.

  • The second is so-called [[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]] CIMM , which has to do with the reliablity of estimates in CMM Level I situations.