Difference between revisions of "Capability Maturity vs. Work on Proposals"

From Cibernética Americana
Line 10: Line 10:
 
</blockquote>
 
</blockquote>
 
<li><blockquote>
 
<li><blockquote>
The second is so-called [[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]] CIMM , which has to do with the reliablity of estimates in CMM Level I situations.
+
The second is so-called </html>[[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]]<html> CIMM , which has to do with the reliablity of estimates in CMM Level I situations.
  
 
</blockquote>
 
</blockquote>

Revision as of 09:31, 21 January 2011



I've prepared this text to efficiently process to common currently occurring and related phenomena.

  • The first is the amount of unpaid work I can put in a lead before I must have some payment if I have not decided to do the work on some other basis.

  • The second is so-called Capability Maturity (CMM) and its antipattern CIMM , which has to do with the reliablity of estimates in CMM Level I situations.